comp3111's Introduction

COMP3111: Software Engineering Final Review

L01

Dealing with complexity

Having clear design goals reduces system's design complexity as it is needed to prioritise client's design goals (qualities).

Modular and Incremental Development reduces complexity of cost and time estimates

  • Module: a part of a system which makes sense to be considered separately
  • Interact with module only via interfaces, which abstracts and encapsulates a module to support information hiding.
  • Reduces complexity of understanding (only need to understand interface) and maintaining (changed without effecting the rest of system) the system

Training Software Engineers which increase effectiveness of software engineering techniques to reduces complexity of building the system

Software Engineering

  • Modeling
  • Problem solving: search solution in the presence of change -> systematic rather than algorithmic
  • Knowledge acquistion
  • Rationale management

L02

UML

General purpose visual modeling language for systems. Independent of the software development methodology / process. Show essential details while filtering out non-essential ones to focus on the programming-in-the-large (see it from the bigger picture).

OO-modeling reduces semantic gap between application model and model:

  • Requirement level: focus identifying objects without implementation. Consists of defining class
  • Analysis & Design level: focus on interfaces of object, how objects interact
  • Implementation level: focus on detail of objects, how to code

Key points on designing UML model:

  • Do not represent operations(generate, browse, enter, lookup) as associations. ==Associations is result of operations, not the operation itself==
  • Do not represent implementation aspects (System, telephone, reports), and client / organisation
  • ==Consider what information about things / procedures needs to be persistent (in files & database)==. If not, no need to include.

Class

Describes a collection of objects (instances) which capture one abstraction theme. Reduces complexity of understanding and specifying the system. Helps modular development.

1543924767234

Attribute describes data values held by objects, consists of:

  • name
  • [type]
  • visibility (public (+), private (-), protected (#), package (~))
  • [initial value]
  • [multiplicity]
  • changeability

Operation: function / transformation applied to the class. Method: operation instance. Consists of:

  • operation signature (name, params. names, result type) -visibiliity.

Association

Description of the links (relationship instance) between two objects. Collection of names and association names must be unique.

Degree of association:

  • Unary (reflexive): relates one class to itself, requires role is one end of an association
  • Binary : relates two classes, etc

Multiplicity specifies restriction on the number of objects in a class that related to one object in another class.

  • Minimum cardinality = 0 : optional participation
  • Minimum cardinality > 0 : mandatory participation (must be related)
  • Maximum cardinality = * : unlimited upper bound
  • Min-card = 1 & max-card = 1 : 1
  • Min-card = 0 & max-card = * : *

"part-of" / "made-of" relationship. Use association when in doubt.

  • Aggregation (hollow rhombus) : a component may exist independent of the aggregate object of which it is a part. Not necessarily have the same life-cycle. Min-card = 0 & max-card = 1 or *. Not every "has" relationship are aggregations.
  • Composition (full rhombus) : may not exist independent and have to have same life-cycle. Min-card = 0 & max-card = 1 or *.

Dynamic model

Dependency relates classes whose behaviour / implementation affect other classes.

  • Flow relates two versions of an object at successive times
  • Usage shows that one class requires another class for its functioning

1543926850630

Realisation relates a specification to its implementation / interface

1543926869721

L03

Association class is used when the association has attribute, most often needed for many-to-many associations.

Generalisation

Relationship between classes of the same kind. Discriminator: attribute of enumeration type that indicates which property of a class is used to create a generalisation relationship. Top-down is specialisation, bottom-up is generalisation.

1543924682778

Inheritance takes up properties by subclass from its superclass, so properties only defined in one place. Reduces redundancy, promotes reusability, simplifies modification. 2 types of coverage:

  1. Disjointess:

    • Overlapping: superclass object can be member of more than one subclass
    • Disjoint: superclass object can be member of at most one subclass
  2. Completeness:

    • Complete: all superclass object must be member of some subclass
    • Incomplete: some superclass object isn't a member of any subclass

    1543925078251

Abstract class is used as a container for definitions, no instances. Applicable for operations as well, which means no method specified.

Constraint is an assertion about properties of model elements which must be satisfied. Consists of: ordering, subset, xor (related to either, not both).

L04

Software Development Projects

Stages of software development:

  • Gather system requirements
  • Analyse and design the system
  • Implement the system
  • Test the system

Types of software development projects:

  • Green field: new development
  • Evolutionary: maintenance
  • Custom: development effort is high
  • Framework / component: reuse. A framework is a software designed to be reused while needing to be adapted

1543928363406

Risk

Risk analysis involves estimating:

  • Likelihood (Ii) that the risk (ri) will occur and establish a scale
  • Consequences and impact (xi) of the risk
  • Accuracy / confidence of the projection

Prioritize risks by perceived impact on the project

Risk planning consists of strategies development to monitor and manage risks. 80:20 rule: 80% of the project risk is accounted for by 20% of identified risks.

Project Organisation

Project organization specifies roles and responsibilities, number of staff in each role, and teams. Task: a well-defined work assignment for a role. Activity: a group of related tasks. Estimating is trying to quantify something before it occurs.

Plan-driven: tasks, activities, and schedules are planned in detail at the start. Agile-driven: incrementally planned as the project progresses.

Process is a complete set of activities / workflows and their sequencing that transforms user requirements into a software product.

L05

Software development process have to consider the characteristics of organisation, project, and people.

Monolithic

Waterfall process should be used when requirements are well understood and unlikely to change. It produces requirements specification, design specification, implemented collection of modules, tested assembly of modules, and keep the system working and up-to-date.

Pros: rigid, easy to monitor, enforce documentation standards before proceeding. Cons: assume possible linear and sequential development, each phase can be frozen due to rigidness, little opportunity for user feedback.

Iterative and Incremental

Code-and-fix

Cycle in implementation and testing with many changes and becomes messy, unpredictable, and uncontrollable. With no requirements specification, often unsuitable for large systems.

Prototyping

is a code-and-fix with client evaluation and enforces discipline. Useful when requirements are vague or unknown as it allows exploration. Final prototype follows the 80:20 rule: 80% of the effort is for 20% of code development.

Pros: explored requirements and different solutions, allows user feedback and approval. Cons: progress hard to measure, poor or absent documentation, final product is not a complete system.

1543934667047

Spiral

Pros: risk evaluation reduce problems, planning and client evaluation phases, iterative and incremental planning and evaluation. Cons: relies on expertise, needs more elaboration of the phases, suitable for internal rather than contract development.

1543934867156

Phased-release

Releases are developed and uses in parallel as change is inevitable. Two types of development:

  • Incremental: partial system, full functionality
  • Iterative: full system, partial functionality

Pros: reduces risk of failure, promotes modularity, fallows frequent releases and appropriate expertise applied as well as early training. Cons: difficult to identify common facilities needed by all pieces, system pieces need to be relatively small.

Agile

Any incremental phased approach where focused on individuals and interactions, working software, client collaboration, and responsive to change. Three practises:

  • Planning poker: for estimating time required to implement a feature
  • Pair programming: for write code for a feature
  • Test Driven Development: used to test the code

Two methods:

  • Extreme Programming: allow client to direct the software development process by selecting features in each iteration, not only specifying requirements. Developer breaks each iteration into tasks done in parallel, that the test cases is designed by pair programming.
  • Scrum: requirements are captured as items in product backlog where the clients sets the priorities. Feature in sprint backlog from product backlog is then developed, tested in one sprints (series of iterations) for which teams is self-organised. Requirements not allowed to change in a sprint. Burndown chart shows total hours remaining each day to complete the sprint.

Pros: flexible, immediate feedback, fewer defect, faster speed-to-market. Cons: daily stand-up meetings and more collaboration required, lack documentation.

==Principles==

  • Rigor and formality: waterfall, spiral
  • Separation, modularity: waterfall, spiral, phased-release
  • Abstraction, generality: waterfall, spiral
  • Change anticipation: spiral, phased-release, agile
  • Incremental development: prototyping, spiral, phased-release, agile
  • Risk assessment: spiral

Unified Process (UP)

Referred as whale-hump picture. Provides generic process framework while defining a set of activities (workflows) and models (artifacts). Each iteration (vertical) produces working product, while each increment (horizontal) establishes a system baseline.

L06

Requirements

Requirement specifies problem (what it should do), not solution (how it is done). Capturing requirement reduces error and cost of software development (cost of defect in requirements are amplified towards the system usage). Two types of requirements:

  • User requirement: mainly for client consisting of constraints and what system provides
  • System requirement: for client and developer consisting of what should be implemented and detailed description

Requirement capture activities include: understanding application domain and user needs, determine risks, capture and validate system requirements

Domain modeling captures most important (without anything irrelevant and describing operation, action, and implementation constructs) classes and their associations by decomposing user requirements, which described in class diagram.

L08

Use-case Modeling

Captures system behaviour from users' POV by describing all required functionality.

Actor represents something outside the system that interacts directly with the system, provides input and receives output. System, devices, input and output devices are not actors.

1543990922518

Use case is a specific way of using the system by performing some of the system's functionalities, describing the interaction between actor and system, constituting a complete normal sequence of events / actions. Represents a major piece of complete functionality

Provides brief description of the purpose of each use case and outline of steps required (flow of events) to perform the use case as the use-case specification.

Scenario is concrete, informal description of a use of the system (instance of use case) from the POV of a single actor. Two viewpoints:

  • Top-down: start with use cases, refine with scenarios
  • Bottom-up: start with scenarios, abstract to use cases.

L09

Use-case Details

Precondition statement about the system, actor must be in for the use case to be performed. Stated so each use-case descriptions are independent to each other

Postcondition statement about the state of system is in at the end of a use-case, about the result of executing the use case. Only used when the use case ends is important for another's use case precondition, and when possible outcomes are not obvious.

Flow of Events

Flow of events is a precise and easy to read description of sequence of actions needed for a use case, what should be done, not how it is being done. It is a sequence of numbered, time-ordered, event-response oriented short steps.

Basic flow: most common path, one complete sequence of actions to mitigate risk of misunderstanding and ambiguity. Alternative flows: optional, exception behaviour and infrequent used functionality which is uniquely-named and defined by extension point, consisting of:

  • Specific alternative flow: starts at specific named point in another flow of events
  • Bounder alternative flow: occur between two points
  • General alternative flow: able to start at any point

First line and last line of an alternative flow's flow of events should state explicitly where the actor starts and resumes the original flow of events.

Extension point: named place in the flow of events where additional behaviour can take place. Kinds of extension points:

  • Single location
  • Set of discrete locations: multiple places
  • Region: pair of extension points which delineates set of locations in-between.

Subflow is a numbered and uniquely-named segment of behaviour within a flow of events to improve readability. It is not a separate use case, rather an integral part.

L10

Non-functional requirement places constraint on a use case / system. It is specified as supplementary requirements in non-functional requirements which is use cases that deal with non-functional requirements.

System Requirement Specification (SRS) should be validated continuously to verify its completeness, consistency, clearness, correctness, realistic. Acceptance tests are used to validate the requirement satisfaction of the system implementation.

System Requirements Capture

Domain modeling captures data requirements by using class diagram which shows different classes and relationships.

Use-case modeling captures functional requirements by using use-case model (provide system functionality and the actors which used it) and flow of events (describe sequence of actions).

Requirement validation verifies the system meets all requirements. These system requirements is documented in SRS.

L11

Implementation

Module: physical and replaceable part of the system which packages implementation and provide set of interfaces. Subsystem organises modules. Modules and subsystems then compiled into executable modules.

Defensive Programming

Values of all data from external resources and all routine input parameters are checked, bad inputs is handled. Barricade are converting input data to the proper type at input time using assertions on pre-, post-condition, and invalid input.

Precondition is an assertion inserted prior to execution; postcondition is an assertion inserted after execution.

Forward reasoning (more intuitive) knows the precondition, and predict the postcondition. Backward reasoning knows the postcondition, predict the precondition.

Refactoring: improving part of software's internal structure without altering its external behaviour, to maintain the code execute its functionality, allow change, and communicate well. Where low-level refactor is supported on IDE, the high-level refactoring includes exchanging obscure language idioms, statements clarifying, performance optimisation, design pattens refactoring.

L12

Debugging Defense

Use debug as a last resort. Modularity: take away pieces until bug disappears, and add pieces back in until bug appears. Modular reasoning: trace through programme while viewing intermediate results.

Regression testing: add a test for whenever a bug was found. Then re-run all the test.

Configuration Management (CM)

Change Management ensures that a system evolution is a managed process which give priority to the most urgent and cost-effective changes. The change management is supported by software library which provide facilities to store, control version and track configuration items' status. Configuration item: artifact going to be controlled changes.

1544034197860

Baseline is a time / phase in the software development after which any changes must be formalised. Change control defines the formal process of making changes to a project, for which the change control authority evaluates it.

Auditing ensures that changes have been properly implemented, usually done by Quality Assurance. Status reporting: communication mechanism that keeps all parties informed on the status of the change. Version management ensures integrity and consistency of configuration items, described by evolution graph shows an item's change history.

L13

Testing

1544073967752

In inception, elaboration, and construction, the focus is on integration and system test. Transition focuses on fixing bugs and regression testing.

Testing finds difference between expected and actual system behaviour through:

  • Validation: build the right product, meet requirements through acceptance test
  • Verification: build the product right, quality of implementation

'

Input space partitioning: partition inputs into sets which shares same behaviour to test each value from each set. Two approaches:

  • Naive approach: execution equivalence
  • Better approach: revealing subdomains (subset of possible inputs). Partition by heuristics on program-dependent and program-independent information.

Design Tests

White Box Test

verifies component logic using knowledge of the internal workings of the component.

Basis path testing executes each independent path at least once by determining set of linearly independent paths based on cyclomatic complexity from the flow graph.

Cyclomatic complexity, V(G): quantitative measure of logical complexity, provides upper bound on number of paths needed to be tested.

V(G) = number of regions (areas bounded by nodes and edges including area outside graphs) 
V(G) = #edges - #nodes + 2 
V(G) = # simple predicate nodes + 1

Independent path must traverse at least one edge in the flow graph that hasn't been traversed before. Basis set is the set of linearly independent paths which is not unique, but guarantees to execute every statement at least once. Basis path testing doesn't test all possible combinations of all paths.

1544075955333

Black Box

verifies component functionality based on inputs and outputs based on knowledge of specified functionality

Regression

verifies no new defects are introduced after change

L14

White Box Testing

Condition testing executes true and false value of each simple logical condition through:

  • Branch testing: test every true and false branches, as covered in basis path testing
  • Domain testing: detection of rel-op (relation operation) error. For expression E1 rel-op E2, test E1 > E2, E1 = E2, E1 < E2 with the difference as small as possible.

Loop testing executes loops at and within their bounds through:

  • Simple loops
  • Nested loops: simple loop test for the innermost while holding outer loops at their minimum iteration values. Work outward
  • Concatenated loops: use simple loop testing for independent loops, nested loop testing for dependent.

Data flow testing ensures variable value is correct at a certain points of execution by selecting test paths based on locations of definitions (S) and uses (S') of a variable (X).

Use (DU) Chain (X) is the set of [X, S, S'] where X is not redefined between S and S`. Test every variable along the path from where the variable is defined to where the variable is used, combined with basis path testing.

Black Box Testing

Cover a range of input and output values to test the presence or absence of a class of errors. Equivalence partitioning creates subdomains by grouping inputs and outputs by type to create test coverage. Select subdomains based on its validity and invalidity.

Boundary testing uses values at the boundaries of a main subdomain. Use minimum values of subdomains which represent both validity and invalidity, and use the minimum and maximum values, as well as just above and just below each the boundary.

Thread testing: event-based approach where tests are based on event which trigger system actions, used after unit test.

State-based testing compare the resulting state of a class with the expected ones. Test cases was derived using state machine diagram, and derived a representative set of stimuli / events for each transition / equivalence testing.

Regression testing: reproduces the bug while recording the input and correct output, and then the test is put into test suit to prevent bug occurrence in the future.

L15

Test component: program that automates one or several, parts or all test procedures. As we develop the system outside in (from client's acceptance testing to unit testing), we test the system inside out.

Testing Strategy

Unit testing

uses both white and black box test to verify the components function correctly. May require driver (component which calls component to be tested) and stubs (component called to be tested).

Integration testing

uses both white and black box test to verify the subsystems interact correctly.

Top down: test top sub-system with stubs, and stubs replaced one at a time, depth- or breadth-first. If new sub-system integrated, do regression testing.

  • Pros: early testing and error detection
  • Cons: low-level processing is done late, require stubs

Bottom up: subsystems are grouped into builds and integrated. Drivers are replaced one at a time depth-first.

  • Pros: interaction fault easily found, easier test case, no stubs
  • Cons: user interaction tested last

Sandwich: top level subsystems tested with stubs, lower level are grouped into build and tested with driver.

  • Pros: parallel testing, shorten testing time
  • Cons: require drivers and stubs

System testing

uses black box test to verify the system functions correctly as a whole. Consists of:

  • Functional: verify system met requirements specification.
  • Performance: design goals & nonfunctional requirements met
  • Pilot: end users verifies common functionality in the target environment. Alpha test: test in controlled environment that users can be observed. Beta test: test in real environment where bugs uncovered from regular usage patterns.
  • Acceptance: verifies function / constraint is fully operational and requirement is met to client.
  • Installation: verifies usability and validates requirements

Acceptance Test

uses black box test to validate against requirements.

L16

System analysis and design structures use-case model and prepares it for implementation to provide precise and detailed understanding of the requirements. It prioritise design goals and develop trade-offs against each other and managerial goals.

General design strategy for technical issues: encapsulate and isolate implementation environment by creating bridge classes that represent occurrences of components in the implementation environment.

Architectural Analysis and Design

Subsystem identifies main structural components and relationship between them to encapsulate its content and provide interface to other subsystem to manage complexity. Subsystem layers consists of:

  • Closed layered: depend only on the layer immediately below it. Lower coupling, higher overhead
  • Open layered: depend on any layer below it. Higher coupling, less overhead

Subsystem partition organises subsystems in one layer into different services, resulted in peer to peer services within a layer.

Architectural Pattern

Multi-layer: software in layers so that each layer only communicate with the one below it.

Repository: centralise data management. Control flow is dictated through via triggers or subsystems using locks to synchronise. Cons: performance and modifiability bottleneck, high coupling between repo and subsystems.

Client-server: separate and distribute system's functionality. Two types:

  • Three-tier: server communicates with client and database server
  • Peer-to-peer: each subsystem can be both a server and a client. Control flow is independent from others except synchronisation request

Broker: distribute aspects of the system transparently to different nodes, such as proxy design pattern.

Transaction Processing: direct input to specialised subsystems (handlers), through transaction dispatcher which decide what to do with each input transaction.

1544085762427

Pipe-and-filter: provide flexibility, modifiability, and reusability of subsystems which can be done concurrently. Input is passed through series of subsystems / filters as pipeline, each of which transform it.

Model-view-controller (MVC): separate user interface layer from other parts.

1544423460334

Use-case Analysis

Aims for a maintainable and stable system as localisation of changes is achieved. Analysis class: abstraction of one or several classes in the final system implementation.

Boundary class models the interaction between system and actors which represents an abstraction of UI elements / communication interface. Encapsulates and isolates changes in the system's interface.

1544087898426

Entity class models information that is often persistent in database, represent the concept of individual, real-life object or event.

1544090485184

Control class models coordination, sequencing, transactions, and control behaviour. Responsible for the flow of events, and only tied to at most one actor. It usually does not have a correspondence in the application domain. Encapsulates and isolates changes to control / business logic.

1544090674060

Design class is a class whose specifications has been completed that it can be implemented, described using the syntax of programming language.

Cohesion is a measure of number of a class functionality, desired to be high. Most cohesive is when it only does one thing. Coupling is a measure of number and types of dependencies, desired to be low. Lowest coupling has minimal dependencies.

L17

State Machine Diagram

State Machine describes the behaviour inside an object. It is directed graph from states of the object (nodes) to events that cause state changes (arcs).

State is a time during the life of an object when it satisfies, performs, and waits for an event. Unnamed state is called anonymous. There is initial (start) state, and final (end) state.

Transition is a change of state from source / originating state to successor / target state. It is uninterrupted, caused by an event trigger, and optionally an guard condition (Boolean expression which must be true). Effect list: atomic expression executed if and when a transition fires.

Event: something that happens at an instantaneous point in time. Types of event:

  • Call event: receipt of a synchronous call (request that an operation to be performed)
  • Signal event: receipt of an asynchronous communication
  • Change event: specified Boolean condition becoming true
  • Time event: absolute time / elapsed time

Events are processed one at a time, and one transition within a state machine may fire. Transition out of a state can be automatic (activity of the state completes) or non-automatic (caused by an event). Transition without labels fire immediately after the activity within a state, if any, completes.

Action: process transition between states which is instantaneous and can't be interrupted. Activity: a process in a state which takes time and can be interrupted.

Composite State Machine Diagram

Composite SMD contains one or more nested SMD.

1544099297055

Sequential composite: exactly one state in one of the nested state machine diagrams. Corresponds to or-condition, used to abstract / generalise states.

Concurrent composite: exactly one state in each of the regions of the state machine diagrams. Corresponds to and-condition, for multi-threading behaviour.

Transitions in composite state may have multiple source and target states, which represent synchronisation or splitting of control. Synchronisation bar which occurs to the boundary (fork) and from the boundary (join) is used for synchronisation.

L18

Design Patterns

Design pattern is a general reusable solution to commonly occurring problem. It facilitates reuse of successful software design which is documented in a pattern catalog.

==Design principle==:

  • Identify aspects of application that vary and separate them from what stays the same.
  • Program to an interface, not an implementation.
  • Favour composition (has-a relationship) over inheritance (is-a relationship).
  • Strive for loosely coupled designs between objects that interact to minimise the interdependency.
  • Classes should be open for extension, but closed for modification (open-closed principle)

Design patterns space:

  • Creational patterns: initialising and configuring classes and objects
  • Structural patterns: decoupling interface and implementation
  • Behavioural patterns: dynamic interactions among societies of classes and objects
  • Concurrency patterns: multi-threaded programming

Strategy pattern makes Client class configured with ConcreteStrategy object maintained through reference to Strategy object. Strategy class declares the interface common to all supported algorithms, which then defined by the ConcreteStrategy.

Observer pattern defines a one-to-many dependency between objects, so that when an object changes state, the dependents are notified and updated automatically.

L19

Design Patterns

Mediator pattern is commonly used to coordinate related GUI components. Mediator class defines interface for communicating with Colleague objects.

  • Pros: decoupled colleagues, comprehension, simplified object protocols, limits subclassing
  • Cons: complexity

Proxy pattern uses an proxy that acts as a stand-in (surrogate) for the real expensive object. Proxy class maintains reference to the real subject for which it control access to the real subject and responsible for it.

Bridge pattern solves the mix of design (abstractions) and implementation inheritance hierarchies by separating the object abstraction and implementation class hierarchies and connect them using a bridge.

Singleton pattern make the class responsible for keeping track of its sole instance, ensure that no other instance can be created, and provide a way to access the instance.

Simple factory pattern enables user to decide at runtime specific subclass instantiation using the open-closed principle.

Anti Patterns

Anti pattern tells what is a bad solution, used as tools for social control.

Spaghetti code: software where it has reached a point of diminishing returns where the effort involved to maintain existing code exceeds the cost of developing a new solution.

Blob / god class: a single class with many attributes / operations which violates the cohesion property of object-oriented design.

L20

Quality Assurance consists of procedures, techniques, and tools to ensure that a product meets or exceeds standards during development cycle. Quality control ensures standards are followed, quality planning selects and tailors standards, quality assurance defines organisational standards. The main goal of quality assurance is to continuously improve the quality.

Software quality is defined through:

  • Design goals or quality attributes that a software must meet
  • Measurement of the quality attributes
  • Track the progress and values of the quality attributes throughout the development
  • Incorporate feedback into the development process to improve its quality attributes

Software Quality Activity

Technical standard is requirement that establishes uniform technical criteria, methods, etc.

  • Product standard focuses on what outcome is produced and define characteristics of the product artifacts should exhibit.
  • Process standard focuses on how outcome is produced and how the software process should be conducted.

Metrics is a objective way to measure quality attributes of software product, process, or artifact. It is used to control development process and predict product quality. As it is difficult to measure quality attributes during the development, internal attributes were instead measure to calculate and predict the quality attributes.

Quality Metrics for System Design

For design component, a design goal is maintainability.

Structural fan-in / fan-out

Fan-in: number of calls to a component by other component. Higher fan-in, higher coupling.

Fan-out: number of components called. Higher fan-out, high complexity (for calling component).

Informational fan-in / fan-out

Considering the number of parameters passed + number of accesses to shared data structures. Useful predictor of effort required for implementation.

Complexity = component-length * (fan-in * fan-out)^2

IEEE Standard

Considers properties of subsystems (number of subsystems and degree of coupling) and database (number of attributes and classes) through DSQI (Design Structure Quality Index); with the value [0,1]. Lower DSQI, further work may be required.

Also able to consider changes made throughout product's history and compute the stability through SMI (Software Maturity Index); with the value [0,1]. Higher SMI, the more stabile.

Quality Metrics for Implementation

For implementation component, design goals are reliability and ease of implementation. Measured based on lines of code, length of identifiers, depth of conditional nesting.

Halstead's Software Science measures based on number of operators and operands in a component, then calculate the values for component volume V (bits), component difficulty D, and effort E required to implement.

McCabe's Complexity Metric measures based on control flow in a component and calculates cyclomatic complexity.

Achieving Product Quality

Statistical Quality Assurance categorises and determines causes of software defects based on 80-20 rule: 80% defect caused by 20% of causes.

Proving programs and specifications are correct through assertions.

Cleanroom Process combine the Statistical Quality Assurance and assertion method.

Achieving Project, Process, and People Quality

Software Configuration Management (SCM) manages, controls, and monitors changes to life cycle artifacts to achieve project quality.

ISO helpsthe assessment of an organisation's software development process:

  • ISO 9000: specifies actions to be taken when quality goals and constraints specified
  • ISO 9001: requires organisation to have documented quality system, which defines and documents the organisation's quality process
  • ISO 9000-3: specifies generic procedures that should be in place to have a quality process. Intended to help client assess the process management capabilities of an organisation.

SEI Process Capability Maturity Model (SEI-CMM) is intended to help organisation assess and improve the development process. Can be a measure of people quality too, known as PCMM.

  • Level 1: Initial process (ad hoc): no formal procedures, no project plans, etc
  • Level 2: Repeatable process (intuitive): focus on management, basic project controls
  • Level 3: Defined process (qualitative): focus on management and engineering, training provided
  • Level 4: Managed process (quantitative): add metrics, measured process, process database established
  • Level 5: Optimising process: add feedback

L21

Project Management

Software Development Plan (SDP) documents the scope of the development effort and how the project will be managed, it defines the project. Work Breakdown Structure (WBS) allow each task to be easily managed, as the SDP breaks the project into tasks and sub-tasks for easier division of labour.

3 levels of schedule:

  • Master schedule: management and client communication, rigid
  • Macro schedule: day-to-day project management, semi-rigid
  • Micro schedule: team management, highly flexible

PERT (Program Evaluation and Review Technique) Chart is a graphical representation of project tasks laid out in the form of a critical path network.

  • Critical path is the longest time path from start to end node.
  • Slack specifies how much the task can be delayed without putting project behind schedule.
  • Dummy task ensures each node has at least one task starting and one task ending at the node.

Risk Planning plans for risk by trying to:

  • foresee what can go wrong before it happens
  • estimate its likelihood of happening and its impact
  • develop cost-efficient contingency plans, actions to take if it happens

Project needs to be monitored consistently and inoffensively, as change is almost inevitable and most likely to fall behind schedule, by holding periodic project status meetings regularly, doing project review, check KPIs are accomplished as planned, compare target and actual budget and start dates for each activities.

Estimates

Size = LOC, # subsystems, # classes, etc
Effort = persons * duration
Productivity = size / effort
Duration = months until delivery
Development cose = labour

Size-oriented metrics is based on past software project to calculate several metrics.

Productivity = KLOC / effort
Cost = $K / KLOC
Quality = errors / KLOC
Documentation = pages / KLOC

Function-oriented metrics is based on properties of the project software.

FP = count-total * {0.65 + 0.01 * sum(Fi)}
Productivity = FP / effort
Cost = $ / FP
Quality = errors / FP
Documentation = pages / FP

System-level Analogy based on previous similar development which uses Delphi technique.

PERT Estimation based on range of values (O, M, P) provided. Expected value E is computed as a weighted average of optimistic O, most likely M, and pessimistic P. StdDev is a measure of schedule of budget risk. The actual size will fall between (E-StdDev) and (E+StdDev) 68% of the time.

E = (O + 4M + P) / 6
StdDev = (P - O) / 6

Planning Poker is based on estimation made by team members, after clarification of assumptions and risk, by playing numbered cards face-down to the table and revealed simultaneously, instead of discussing the number.

Parametric Models uses parametric formulas, empirically derived to predict a project resources.

comp3111's People

Contributors

nwihardjo avatar

Watchers

 avatar

Recommend Projects

  • React photo React

    A declarative, efficient, and flexible JavaScript library for building user interfaces.

  • Vue.js photo Vue.js

    ๐Ÿ–– Vue.js is a progressive, incrementally-adoptable JavaScript framework for building UI on the web.

  • Typescript photo Typescript

    TypeScript is a superset of JavaScript that compiles to clean JavaScript output.

  • TensorFlow photo TensorFlow

    An Open Source Machine Learning Framework for Everyone

  • Django photo Django

    The Web framework for perfectionists with deadlines.

  • D3 photo D3

    Bring data to life with SVG, Canvas and HTML. ๐Ÿ“Š๐Ÿ“ˆ๐ŸŽ‰

Recommend Topics

  • javascript

    JavaScript (JS) is a lightweight interpreted programming language with first-class functions.

  • web

    Some thing interesting about web. New door for the world.

  • server

    A server is a program made to process requests and deliver data to clients.

  • Machine learning

    Machine learning is a way of modeling and interpreting data that allows a piece of software to respond intelligently.

  • Game

    Some thing interesting about game, make everyone happy.

Recommend Org

  • Facebook photo Facebook

    We are working to build community through open source technology. NB: members must have two-factor auth.

  • Microsoft photo Microsoft

    Open source projects and samples from Microsoft.

  • Google photo Google

    Google โค๏ธ Open Source for everyone.

  • D3 photo D3

    Data-Driven Documents codes.