google / ezgantt Goto Github PK
View Code? Open in Web Editor NEWezGantt main
Home Page: https://ezgantt.appspot.com
License: Apache License 2.0
ezGantt main
Home Page: https://ezgantt.appspot.com
License: Apache License 2.0
When using the normal date format (i.e. dd/mm/yyyy), it assumes the strange US format where the month is the first number.
In your README.md you have:
ezGantt uses public Google Chart and Google Drive JavaScript APIs, so the same users who can view the Spreadsheet can see the Gantt chart. To try it, go to https://ezgantt.appspot.com/#1kYfoEFXW-psZ8AMy0Ne7wRMiM3umNKBs3v9U7nvafXA
Clicking on this link this in Firefox 96 on Ubuntu 21.10 produces the noted error popup:
App error: TypeError: dialog.showModal is not a function
Clicking on the Edit link in the sample pops up the same error.
Meanwhile nothing much shows up in the screen itself beyond the header bar.
Hi guys, first of all I have to say that this feature is great, and it is well appreciate from my side. But I have an error, and it is that when sharing the document with other person, this person is not allow to see the ezGantt link, they can edit the spreadsheet but a popup appears when you click on ezGantt link that says that you don't have access to it.
Am I missing something to share the whole thing? that is the spreadsheet itself and the privilege to access the ezGantt.
Thanks in advance
When a task name is long, the display cuts off from the left hand side in the display.
Can we make sure we support higher number of words for display in the task name. Currently it cuts off task name from left side after 30 characters
I'm currently working on a gantt project for work, I was interested in viewing your gantt example, but I'm not interested in letting anyone access my google account. Just giving some feedback. :)
Currently, when a user sets up "Start Date" and Duration columns, the graph would include weekend days to calculate task duration.
Please either provide a control/setting for switching between calendar days/work days) or simply make "work days" default state.
Currently, the time estimates include the weekend which is probably not something that should be done by default. It would be nice if the default behavior was to ignore Sat / Sun and optionally allow weekends to be included.
It seems that API has changed or something, but even the regular demo is not working
I just get "app error"
The system should gracefully ignore data in a column with no header value.
Please add a description column: task name proved to be too short. Description can be used only in the hover blob.
This is an issue in the Gantt rendering widget, but could possibly be checked for in the ezgantt script (because the rendering widget does not give good advice on how to fix an issue)
If you have a task with a dependency and an end date, you have to make an assumption that the task will go from the end of the dependency to the end date. That assumption makes the gantt tool sad - it could span the entire time, or just the last day.
Recently we had a user that had to switch their (technically valid) list of end dates+dependencies to duration+dependencies.
Currently, ezgantt doesn't keep the same ordering of the tasks in the gantt view as in the spreadsheet. More of a feature request than a bug I guess.
A declarative, efficient, and flexible JavaScript library for building user interfaces.
๐ Vue.js is a progressive, incrementally-adoptable JavaScript framework for building UI on the web.
TypeScript is a superset of JavaScript that compiles to clean JavaScript output.
An Open Source Machine Learning Framework for Everyone
The Web framework for perfectionists with deadlines.
A PHP framework for web artisans
Bring data to life with SVG, Canvas and HTML. ๐๐๐
JavaScript (JS) is a lightweight interpreted programming language with first-class functions.
Some thing interesting about web. New door for the world.
A server is a program made to process requests and deliver data to clients.
Machine learning is a way of modeling and interpreting data that allows a piece of software to respond intelligently.
Some thing interesting about visualization, use data art
Some thing interesting about game, make everyone happy.
We are working to build community through open source technology. NB: members must have two-factor auth.
Open source projects and samples from Microsoft.
Google โค๏ธ Open Source for everyone.
Alibaba Open Source for everyone
Data-Driven Documents codes.
China tencent open source team.